Avoid delays & increased maintenance
Improve personnel safety by limiting exposure – Quantifiable hazard exposure reduction.
Rollers must be inspected whilst still rolling!! This is dangerous!
Often batches or ‘zones’ of rollers are replaced all at the same time, when the fact is that only a handful of rollers actually require replacement.
Unnecessary quantities of rollers are replaced due to the FEAR of future failure events that stop production.
Adding additional manual handling tasks and elevated exposure to associated injuries for maintenance personnel.
Is your operation at risk?
1 in 50 year event annualised cost | 1 in 100 year event annualised cost | |
---|---|---|
$20M incident |
$400,000 | $200,000 |
$100M incident |
$2,000,000 | $1,000,000 |
The Vayeron Return on Investment (ROI) is that you mitigate the risk of catastrophic roller failure. Along with saving you labour $ and Downtime $, you can rest assured that your ‘hidden risk’ is mitigated.
What is your annualised cost of carrying this unmitigated risk?
Access the Vayeron Smart-Idler® Data, streamed direct from your conveyor to your fingertips
Integrate with 3rd Party Systems / Software / Equipment on site
Better manage the deployment of your maintenance resources
Replace only the conveyor rollers that have the detected issues
vayeron in action
With an annual loss of production totalling $1,294,780 plus $48,913 in labour costs this section of the Ore processing plant needed a solution that reduced roller issues and drastically reduced their annualised costs.
At Vayeron we deliver value with the security of a software platform that will help you to mitigate risk, we supply sensors that equip you with the data you need and a support package to help you to eliminate roller related incidents such as:
Start Smart | Conveyor Smart | Site Smart | Enterprise Smart | |
---|---|---|---|---|
Quantity (Sensors) | 1 to 1,000 | >1,000 to 5,000 | >5,000 to 12,500 |
>12,500 |
Data Price per sensor (per month) | Contact Vayeron – min 500 sensors | 47% discount on Start Smart | 60% discount on Start Smart | P.O.A |
Support Allowance (included per month) | <4 hours | 8 hours | 16 hours | P.O.A |
Installation & Commissioning * can be done by mine personnel or 3rd party contractor |
TBA | TBA | TBA | TBA |
To order, contact us directly and we will connect you to the right partner or one of our Value Added Resellers.
QLD – Coal, NSW – Coal & Gold, North Western WA – Iron Ore, Southwestern WA – Gold, Mid North Western WA – Iron Ore, Southwestern WA – Bauxite
Nevada – Gold
Quebec – Iron ore
North of Country – Copper
Port & Iron ore
Coal Fired Power Station
Steel Mill
Want to know more about installing one of our products/systems on your site? Find the answer and more here. If you still want to know more, please contact us now.
The on-board analysis technology of Smart-Idler® has been proven to detect a roller bearing defect at stage two of a four stage failure progression. This provides months of warning before catastrophic failure so that conveyor roller maintenance can be arranged during a scheduled downtime period.
Smart-Idler® also detects roller bearing failure by sensing acoustics and temperature. This means that all modes of conveyor roller bearing failure can be detected and tracked as the condition worsens. The severity of the failure can be escalated in the reporting software for urgent attention. Smart-Idler® can accurately determine conveyor roller shell-wear and report for maintenance the rollers which should be changed out due to thinning shells.
No. The Smart-Idler® system can still operate with great results when implemented in localised areas on the conveyor, such as high wear zones, hard-to-inspect areas and dangerous locations, such as tunnels or high gantry sections of conveyor.
Yes. The Smart-Idler® is designed to be integrated with a universal range of conveyor rollers during manufacture. In the case where an integration is particularly tricky, the Vayeron® team is always available to ensure that the product can be integrated, one way or another.
The Smart-Idler® conveyor roller sensor is designed to last 10+ years. This is well beyond the average life expectancy of a conveyor roller (~3-5 years). At best case (clean laboratory conditions), a quality conveyor roller bearing should achieve approximately 80,000 hours of operation.
Even with this design requirement, the American Bearing Manufacturers Association (ABMA) indicates that 10% of all bearings will fail early during their design life. This is an added reason that Smart-Idler® should be used as a safety-net sub-component of a conveyor roller.
Globally, conveyor roller failure is the number one cause of fires in underground coal mines. This poses a hazard to personnel in these explosive environments. Currently, without an adequate solution, this risk is unfortunately tolerated.
The Smart-Idler® system helps with statutory compliance in underground coal mines and other conveyors at risk of combustion while greatly reducing hazards for personnel and equipment. In Australia, there is a statutory requirement to limit the surface temperature of any component in an underground coal mine to a maximum of 150 degrees Celsius. It is a fact that a conveyor roller bearing failure can reach temperatures beyond this.
Smart-Idler® technology alerts you to high roller temperatures and pre-empts failing rollers, making it a diligent solution to this no-longer-necessary risk. It also reduces the need for manual roller inspection, removing personnel from harm’s way.
Conveyor-roller-related downtime is in the top three causes of unscheduled conveyor production stoppages. The amount of money the Smart-Idler® system can save your operation is dependent on a few variables specific to your site and commodity. Every operation knows the cost to the bottom line associated with unplanned downtime, LTI’s and production delays. By eliminating these associated costs, the total cost of ownership (TCO) of the roller can be reduced significantly and personnel can be assigned to more critical tasks.
Ultimately, every roller will fail, it’s a matter of when and how. Smart-Idler® provides a previously non-existent safety net allowing you to get the most life out of your roller, before it fails and causes damage. This can save millions per annum for some operations. In one calculated Pilbara Iron Ore scenario, the technology payback occurred in the first 15 minutes of saved downtime.
Once an initial gateway has been installed (often as simple as mounting an electric enclosure and ensuring an adequate power supply), the rollers themselves are a drop-in replacement for conventional conveyor rollers. The laborious manual tagging or data entry process when recording a roller failure is replaced by an RFID scanner/android phone, which can assign frame location and idler number to the newly inserted smart roller. This allows physical location information to be matched to a smart roller that will send a condition alert back to base.
Every bulk handling conveyor operation has problem areas throughout the site. These are areas where roller failure is higher than the site average, or inspection is difficult/not safe. By targeting these areas first and installing batches of rollers in these locations, a faster realisation of the benefits of the Smart-Idler®™ technology and therefore a greater return on investment can be achieved.
After problem areas are addressed, more widespread coverage can be achieved by replacing conventional rollers with Smart-Idler®-enabled rollers as a part of the site’s regular maintenance roller change-out schedule. Over a period of time, it is possible to phase in comprehensive use of the technology across the entire site.
Other benefits include:
Vayeron® is a ‘Hardware-Enabled, Data-as-a-Service’ company. The Vayeron® system reports to a default cloud-based platform, however, we have built an enormous amount of flexibility into the technology. We can send data to the site PLC for SCADA integration, or into other third-party software platforms. Ultimately, the customer pays for the ‘data access’, rather than the platform we provide.
None that detect roller failure as holistically as Vayeron®’s Smart-Idler® technology.
Fragile fibre optic cable is an alternative technology which is still in a research and development stage, with testing still being conducted to demonstrate system reliability. It focuses on applying acoustic monitoring only. A major downside of using fibre optic cable routed along the conveyor length is that any damage to the cable will likely require replacement of the entire cable length. To ensure adequate monitoring coverage, the optic fibre requires a ‘spider-web’ like installation around the conveyor and the components which are to be monitored. It is a cumbersome solution to ‘drape’ over the conveyor.
Smart-Idler® is the only system in the world that monitors temperature, acoustics, vibration and roller shell-wear, to accurately predict roller failure in advance. It is also the only technology in the world which will hone in on the exact roller which is failing.
There is no substitute for monitoring the problem at the source and utilising the array of detection methods that Smart-Idler® employs.
If you would like to discuss how to maximise operational efficiencies and reduce “condition monitoring” operational costs – enquire here and one of our friendly team will be back in contact with you.
BEFORE INSTALLING SMART-IDLER®
Roller Related Expenses | Year 1 | Year 2 | Year 3 | Year 4 |
---|---|---|---|---|
Annual conveyor roller incident costs | $1,294,780 | $1,294,780 | $1,294,780 | $1,294,780 |
Annual conveyor belt crew labour for rollers | $48,913 | $48,913 | $48,913 | $48,913 |
Annual conveyor roller replacement costs | $1,250 | $1,250 | $1,250 | $1,250 |
Annual roller related expenses | $1,344,810 | $1,344,810 | $1,344,810 | $1,344,810 |
Roller Related Expenses | Year 1 | Year 2 | Year 3 | Year 4 |
---|---|---|---|---|
Annual conveyor roller incident costs | $0 | $0 | $0 | $0 |
Annual conveyor belt crew labour for rollers | $0 | $0 | $0 | $0 |
Annual conveyor roller replacement costs | $24,600 | $2,201 | $2,201 | $2,201 |
Annual software cost to manage smart idler | $15,000 | $15,000 | $15,000 | $15,000 |
Annual roller related expenses | $39,600 | $39,600 | $39,600 | $39,600 |
Return on Investment | Year 1 | Year 2 | Year 3 | Year 4 |
---|---|---|---|---|
Vayeron Return on Investment Multiple | 33.9 | 78.2 | 78.2 | 78.2 |
Time to payback (months) | 0.5 | 0.1 | 0.1 | 0.1 |
Year 1 | Year 2 | Year 3 | Year 4 | |
---|---|---|---|---|
ROI multiple if we price in catastrophic risk | 78.2 | 349 | 349 | 349 |
Time to payback (months) | 0.2 | 0 | 0 | 0 |
Reduction in Risk Exposure (man hours) | 375 | 375 | 375 | 375 |